Case Studie:

A HR consultancy services provider

Successful running multi stakeholder collaborative production cycles:


Company is collaborating in a high volume volatile production cycle with multiple stakeholders each providing part for final product in a closed process on multiple locations:

The company has two unique challenges:
1. Solving the miss-alignment in information between the different stakeholders resulting in increased production cost, waste increase and missing dead-lines.
2. No feedback loop to use information for future learnings, thus making the same mistakes over and over.

Effective production with multiple stakeholders on different locations require a on neural network with dashboards for every stakeholder to work dynamically with the right information, at the right time, at the right place, with all information such as specifications, supply chain etc that can simulate every step in the process reflecting the different dimensions such as time and cost line real-time and interactive between all stakeholders.

KEY has solved this by creating the dynamic automated production cycle simulation for all stakeholders to collaboratively work with, so that one source of truth is generated within its collaborative network. Key is implemented as a dynamic intelligent layer above all stakeholder existing infrastructure, therefore not interfering with its current systems.